
Loading / Unloading 2

Salt being unloaded from the Canadian Transport

Grain being loaded at Cenex Harvest States onto the Pineglen.

Stone being unloaded from Kaye E. Barker ar DM&IR ore docks in Duluth (stone from Port Dolmite)

Taconite being loaded at Silver Bay's North Shore Mining facility

The Fairload discharging 49 peices heavy equipment for Alberta. When offloaded, 5 pieces will travel by truck, the rest (44) will go by train to Alberta, Canada.

Pineglen loading at Cenex Harvest States

Ocean vessel loading at a grain Upper Lakes Mission Terminal Elevator in Thunder Bay

CSL Tadoussac loading at BN-SF in Superior

Middletown loading in Silver Bay MN

Edgar B. Speer loading at DM&IR in Two Harbors, MN

CSL Tadoussac loading at BN-SF

Kaye E. Barker unloading limestone at DM&IR in Duluth july 4th 03

Gordon C. Leitch waiting to load at DM&IR ore docks in Two Harbors MN
The Joseph L. Block loading in Two Harbors.
Another view at Two Harbors.
Looking aft while loading at BN-SF5
Av view looking down the tops of the loading conveyors.
A view under the loading conveyors.
Builders Plate.
Looking aft on the main deck.
The aft Structure includes the #1 Sign, the Engine Room, stacks, unloading control room, and the self unloader.
Looking forward from above the unloading control room.
Docked at BN-SF5
The Kwintebank at the Port of Duluth dock.
Algontario

The Algontario at St. Lawrence Cement

The unloader at St.Lawrence cement taking the cement off of the Algontario

On the deck

What the unloader looks like from the deck of the ship

A view from teh side of the pilot house

Docked

The Armco at Cutler unloading

Algonorth loading at AGP elevator in Duluth, Summer 04

Indiana Harbor loading at SMET, summer 04

Another view of the Indiana Harbor loading at SMET

Bluewing loading at Cenex Harvest States Dock #2

M/V Woody loading at Cenex Harvest States dock #1 on the same date as the picture above

The Joseph H. Frantz loading as seen from the Pilot House of the Indiana Harbor

The Lee A. Tregurtha Loading at Two Harbors in January with a fresh coat of Ice

The Philip R. Clarke unloading limestone and the American Mariner Loading taconite at DM&IR in Duluth
Algolake

looking forward

Capt. Anders Rasmussen

loading

Loading

Looking forward

The Burns Harbor is delayed into the night while loading at BN-SF, while the Stewart J. Cort awaits the dock at anchor in the lake

The St. Clair and the Cason J. Calloway loading in Two Harbors, both due out at around the same time

A ships you maybe only see once or twice in Duluth/Superior, the Rt. Hon Paul J. Martin waiting to load
Copyright all images by Sam Lapinski